Ensuring Reliability for Suralaya’s Mill Upgrade Through FAT and Dome Assessment with Datong’s On-Site Support at the Manufacturer
Ensuring Reliability for Suralaya’s Mill Upgrade Through FAT and Dome Assessment with Datong’s On-Site Support at the Manufacturer The Factory Acceptance Test (FAT) is a critical quality assurance milestone in large-scale power plant equipment procurement, ensuring that all systems operate according to contractual specifications before deployment to site. For the Pulverizer Upgrade of Units 5–7 […]
Read MoreStrengthening Coal Mill Reliability: UBP Suralaya Conducts Benchmark Visit to PLTU Tanjung Awar-Awar with Datong Jaya Indonesia
Strengthening Coal Mill Reliability: UBP Suralaya Conducts Benchmark Visit to PLTU Tanjung Awar-Awar with Datong Jaya Indonesia A benchmark visit by PT PLN Indonesia Power UBP Suralaya to PLTU Tanjung Awar-Awar was held on 26–28 November 2025 as part of an essential technical study to strengthen operational readiness for the planned Coal Mill Upgrade Project […]
Read MorePowering Progress for PLTU Efficiency: Datong Secures Dual MoU with PLN NP Services and PLN NP Construction
Powering Progress for PLTU Efficiency: Datong Secures Dual MoUs with NP Services and NP Construction Strengthening PLTU Technology Through Strategic Collaboration PT Datong Jaya Indonesia reinforced its commitment to driving innovation in Indonesia’s power generation sector by signing two important Memorandums of Understanding during Electricity Connect 2025, held at the Jakarta International Convention Center (JICC). […]
Read MoreDatong Jaya Indonesia Highlights Innovation and Expertise at Electricity Connect 2025
Datong Jaya Indonesia showcases engineering innovation at Electricity Connect 2025. Electricity Connect 2025, held from 19–21 November 2025 at Jakarta International Convention Center (JICC), stands as one of Indonesia’s leading annual forums bringing together PLN, IPPs, EPC contractors, technology innovators, and government stakeholders. The event serves as a collaborative platform to accelerate discussions on grid […]
Read MoreDatong Jaya Indonesia Advances Clean Energy Dialogue at the 91st IEA-FBC TPC Meeting in Bandung
Datong Jaya Indonesia Advances Clean Energy Dialogue at the 91st IEA-FBC TPC Meeting in Bandung The 91st IEA – Fluidized Bed Conversion Technology Collaboration Programme (FBC TCP) Meeting, held on 14–17 November 2025 at the CRCS Building, ITB Ganesha, positioned Bandung as a global hub for discussions on clean and efficient energy technologies. Supported by […]
Read More



