Advancing Coal Handling Reliability Through Anti Blocking Solutions: Datong Jaya Indonesia at PLN Nusantara Power PGD
Driving Coal Feeder Reliability: Datong Shares Anti Blocking Best Practices at PLN Nusantara Power PGD On 3–4 June 2026, PLN Nusantara Power through the HSSE and Reliability (REL) function organized the Peer Group Discussion (PGD) Coal Feeder Penanganan Anti Blocking in Jakarta. The event was initiated in response to several operational incidents related to coal […]
Read MoreEnsuring Reliability for Suralaya’s Mill Upgrade Through FAT and Dome Assessment with Datong’s On-Site Support at the Manufacturer
Ensuring Reliability for Suralaya’s Mill Upgrade Through FAT and Dome Assessment with Datong’s On-Site Support at the Manufacturer The Factory Acceptance Test (FAT) is a critical quality assurance milestone in large-scale power plant equipment procurement, ensuring that all systems operate according to contractual specifications before deployment to site. For the Pulverizer Upgrade of Units 5–7 […]
Read MoreStrengthening Coal Mill Reliability: UBP Suralaya Conducts Benchmark Visit to PLTU Tanjung Awar-Awar with Datong Jaya Indonesia
Strengthening Coal Mill Reliability: UBP Suralaya Conducts Benchmark Visit to PLTU Tanjung Awar-Awar with Datong Jaya Indonesia A benchmark visit by PT PLN Indonesia Power UBP Suralaya to PLTU Tanjung Awar-Awar was held on 26–28 November 2025 as part of an essential technical study to strengthen operational readiness for the planned Coal Mill Upgrade Project […]
Read More



