Overview

Project Name :

Installation of Rapping Hammer ESP

Client :

PLTU Labuhan Angin

Installation of Rapping Hammer ESP PLTU Labuhan Angin

Electrostatic Precipitator (ESP) is a system of equipment installed in Coal fire power plant, to reduce particulate emission in a flue gas before the gas being release to the atmosphere. For this time, Perform the installation of the Rapping Hammer on the Electrostatic Precipitator (ESP) system at a Coal-Fired Power Plant (CFPP). This task includes the assembly, adjustment, and testing of the Rapping Hammer component, which functions to periodically dislodge dust deposits from the ESP electrodes to maintain emission control efficiency and ensure optimal environmental performance of the power plant. The installation process is carried out in accordance with occupational safety standards and technical specifications.