| 1 |
PT BEST PLTU Tanjung Enim 3x10 MW |
Pengadaan Pipa Superheater Boiler Unit #1, #2 dan #3 PLTU Tanjung Enim 3x10 MW (SPPH-012) |
| 2 |
PT DSSP Power Kendari |
Generator Carbon Brush Holder |
| 3 |
PT DSSP Power Kendari |
Guided Radar Level Transmitter |
| 4 |
PT DSSP Power Kendari |
Rubber Gasket |
| 5 |
PT DSSP Power Kendari |
Service Supply Part Waterjet Harvest |
| 6 |
PT DSSP Power Sumsel |
Seal Ring Gasket |
| 7 |
PT DSSP Power Sumsel |
Butterfly Valve dan Gate Valve |
| 8 |
PT DSSP Power Sumsel |
Vacuum Cleaner EHFD30 |
| 9 |
PT DSSP Power Sumsel |
Ultrasonic Thickness Gauge |
| 10 |
PT PLN IP UBP Banten 1 Suralaya |
Pengadaan Material Ignitor dan Burner Tahun 2026 |
| 11 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
Pengadaan Pompa TSW Unit 4 |
| 12 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
Pengadaan Pompa GSCW |
| 13 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
Pengadaan GSC Fan |
| 14 |
PT PLN Nusantara Power UP Paiton |
Pengadaan Revitalisasi Chlorine Plant Paiton |
| 15 |
PT PLN Nusantara Power UP Tj Awar Awar |
Pengadaan Penambahan Chlorine Plant PT PLN UP Tj Awar Awar |
| 16 |
PT PLN Nusantara Power UP Pulang Pisau |
Pengadaan Boiler Feed Pump PLTU Pulang Pisau |
| 17 |
PT PLN SC (PLTU UP Anggrek) |
Material Tube Boiler |
| 18 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
Retrofit dan Pengadaan Sparepart Antiblocking Inlet Coal Feeder Unit 4 |
| 19 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
Pengadaan Manifold HPT Turbin |
| 20 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-50-051-SI1 PENGADAAN PART LSV BFPT |
| 21 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-25-50-077-SE3 PENGADAAN HPT BFPT |
| 22 |
PT PLN Indonesia Power UBP Banten 2 Labuan |
Pengadaan Bearing MOP turbin |
| 23 |
PT PLN Indonesia Power UBP Suralaya |
Jasa Penggantian Gate Bunker Antiblocking Unit 4 |
| 24 |
PT PLN Indonesia Power UBP Pangkalan Susu |
Pemasangan Antiblocking Outlet Coal Feeder Unit 3 - 4 |
| 25 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-51-014-SE2 PENGADAAN SPRING GLANDSEAL TURBIN |
| 26 |
PT PLN Indonesia Power UBP Holtekamp |
Pengadaan Sparepart Coal Thrower Unit 1 |
| 27 |
PLN Suku Cadang (PT PLN Indonesia Power UBP Banten 1 Suralaya) |
Pengadaan Sparepart Pulverizer |
| 28 |
PLN Suku Cadang (PT PLN Indonesia Power UBP Banten 2 Labuan) |
Pengadaan HSBT Unit 1 |
| 29 |
PLN Suku Cadang (PT PLN Nusantara Power UP Indramayu) |
Gearbox Upper Lower Anti Clogging |
| 30 |
PLN Suku Cadang (PT PLN Indonesia Power UBP Lontar) |
Parts Part Mill |
| 31 |
PLN Suku Cadang (PT PLN Nusantara Power UP Paiton 9) |
Journal Head (Trunion) Mill |
| 32 |
PLN Suku Cadang (PT PLN Nusantara Power UP Paiton) |
Accessories Gearbox Mill |
| 33 |
PLN Suku Cadang (PT PLN Nusantara Power UP Pulang Pisau) |
Tube APH Boiler |
| 34 |
PLN Suku Cadang (PT PLN Nusantara Power UP Paiton 9) |
Inner Part Coal Mill |
| 35 |
PLN Suku Cadang (PT PLN Nusantara Power UP Tanjung Awar Awar) |
Main Sootblower Parts |
| 36 |
PLN Suku Cadang (PT PLN Nusantara Power UP Singkawang) |
Anti Blocking Coal Handling System |
| 37 |
PLN Suku Cadang (PT PLN Nusantara Power UP Paiton 1-2) |
Anti Blocking Coal Feeder #2 |
| 38 |
PLN Suku Cadang (PT PLN Nusantara Power Tanjung Awar Awar) |
Inner Part Mill 2026 |
| 39 |
PT PLN Indonesia Power UBP Teluk Sirih |
Valve Outlet Transporter dan Coil PCV Unit 2 |
| 40 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-51-020-SE2 PENGADAAN HPT TURBIN |
| 41 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-51-021-SE2 PENGADAAN GSC FAN |
| 42 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26HAR-A5-51-019-SE2 PENGADAAN HPT BLOCK BFPT |
| 43 |
PT PLN Indonesia Power UBP Banten 3 Lontar |
M26OTG-3D-OH4-029 PENGADAAN POMPA RAW WATER UNIT 4 |
| 44 |
PT PLN Nusantara Power Services (PLTU Kendari Unit 3) |
Pengadaan Material Pompa Recycle PLTU Kendari Unit 3 |